The scope of work for at Appalachian State University’s Valborg Theater was to remove the existing aluminum & glass entrance tower and replace with a more modern version. The new entry structure was constructed using concrete, steel columns / beams & light gauge metal framing. The exterior finishes were assembled with aluminum storefront & wall panels in ASU’s signature Hartford Green with a white box soffit & Elk Stone veneer. This project also included updating the lobby with all new electrical fixtures, reworking the existing HVAC system, new acoustical ceilings, resilient plank flooring and a fresh coat of paint. Site work was minimal on this job as ASU handled most of this work in house. This project was complete on schedule for the grand opening production in the fall of 2014.
Betty’s biscuits
Restaurant upfit project which included both interior and exterior upgrades and finishes. Photo credits Common Goods @commongoodinterior of downtown Boone, NC.