Wilderness Run Alpine Coaster

Wilderness Run Alpine Coaster

Located in Banner Elk, Wilderness Run is the first alpine coaster in the North Carolina Blue Ridge Mountains and has over 2,300 feet of pure fun. GCI is proud to have been part of the team that helped two amazing individuals with a dream of bringing more outdoor fun...

read more
ASU Founders Plaza

ASU Founders Plaza

Founders Plaza was constructed as a tribute to Appalachian’s founders, B.B. and D.D. Dougherty and Lillie Shull Dougherty, and is located at ASU’s main entrance sign area off Hardin Street near Durham Park area. The new plaza provides a larger, more iconic setting for...

read more
Wallace Duplex

Wallace Duplex

Construction of rarely appointed duplex units with two-car garages in the heart of downtown Boone NC.  Challenges included steep site and tight building footprint.  A unique opportunity for vibrant walk-friendly living!

read more
Residential Patio

Residential Patio

Nearly impossible to access, a private showplace patio with spa and outdoor kitchen was constructed for a longtime friend of GCI.  All masonry construction with the finest detailing.

read more
King Street Flats

King Street Flats

Master planned mixed-use healthcare space, indoor parking garage, and 60 modern luxury studio apartment units.  High-end finishes inside a traditionally-styled exterior.  This was a closely-coordinated team effort with local developers, the Town of Boone, downtown...

read more
ABC Store

ABC Store

The town of Boone ABC store project included a partial renovation of the showroom and display area, a large addition to the building, and complete renovation of the site work.  The showroom was expanded to and finished to match the existing showroom.  The...

read more
ASU Steam Upfit

ASU Steam Upfit

As Appalachian State expands there is a continuing need to update and enlarge the aging steam heating lines that heat each building.  The Steam Tunnel Project phase 1 is well under way to providing new steam lines to the Holmes Convocation Center.  This...

read more
Tanger Outlets Sinkhole Repair

Tanger Outlets Sinkhole Repair

After an unusually large amount of rain last year a large sinkhole formed in the middle of the Tanger Outlets shopping center entrance.  Greene Construction responded immediately by constructing a temporary entrance.  After over a year we have finished the...

read more
ASU Rivers Street Parking Deck

ASU Rivers Street Parking Deck

Due to high winds and accumulation of snow there was a need for some sort of protection for the elevators and passengers at the River’s Street parking deck.  Greene Construction installed storefront glass and frames on each floor in order to protect the valuable...

read more
ASU Data Center

ASU Data Center

The Data Center is a state of the art media center for Appalachian State.  The renovation involved demolition and construction for a new mail and data room including new flooring, partition walls and finishes.  We also graded and built retaining walls in...

read more
ASU Turchin Center for Visual Arts

ASU Turchin Center for Visual Arts

The Turchin Center is an art gallery along King St. that holds many of the universities best art pieces.  With such high profile works on a high profile building this project had to stay on track and on time.  The Turchin Center had a modern bridge...

read more
First Baptist Church Boone

First Baptist Church Boone

First Baptist was an exciting renovation to be a part of!  We have put in many hard hours to a historical church originally built in the 1930's. We had to do a complete renovation of the electrical, plumbing, and heating/cooler systems.  We removed and...

read more
ASU Valborg Theatre

ASU Valborg Theatre

The scope of work for at Appalachian State University's Valborg Theater was to remove the existing aluminum & glass entrance tower and replace with a more modern version. The new entry structure was constructed using concrete, steel...

read more
Middlefork Greenway

Middlefork Greenway

With the construction of an 8 mile Greenway taking place from Blowing Rock to Boone, Greene Construction was brought in to perform the complicated task of re-routing the river to create an open path for the greenway.  We had to build temporary dams and shut off...

read more
Mast General Store Online Sales Office

Mast General Store Online Sales Office

Years of tire dust and grease from the old Vance Tire recapping building is part of what made this project so exciting to work on. Mast general Store hired Greene Construction to renovate this large warehouse space into a modern online sales office. The project came...

read more
Town of Boone Water Plant Storage

Town of Boone Water Plant Storage

With the clean water needs of the Town of Boone increasing, the need for extra room at the intake plant increased as well. We worked with officials at the Water Treatment Plant off of Deck Hill Rd. to create a large storage area and maintenance bay between the two...

read more
Blowing Rock – American Legion

Blowing Rock – American Legion

First built and opened in the late 1940s by a group of WWII veterans returned home from the war, the American Legion Hall has been a fixture of the Blowing Rock community for many decades. GCI was honored to have the opportunity to work with the Town of Blowing Rock...

read more
Chapell Wilson Hardscape

Chapell Wilson Hardscape

This project was bid in two different phases, but was combined together after GCI secured both contracts. The scope of work included demolition of existing construction along the drive, adjacent to the roadway around and in front of the building....

read more
Peacock Hall – Appalachian State University

Peacock Hall – Appalachian State University

This project is composed of selective demolition and interior uplift of 4 distinct areas within Peacock Hall. Renovations of classrooms and existing entry into new entry and lounge space. Renovate two existing classroom. Renovate an office suite on the second...

read more
Penland School of Craft

Penland School of Craft

This project is generally described as renovations and additions to an existing Gallery space, listed in the National Register of Historic places by the United States Dept. of Interior in 1930. The consists of approximately 5450 square feet of existing second level...

read more