In order to provide a dry, wind free path to the Cancer Center from Watauga Medical Center; GCI was brought in to build a sheltered walkway in between. This involved 2 new exterior doors, and a covered glass walkway next to an existing building. Patients can now travel between buildings without worrying about the weather.
ASU Rivers Street Parking Deck
Due to high winds and accumulation of snow there was a need for some sort of protection for the elevators and passengers at the River’s Street parking deck. Greene Construction installed storefront glass and frames on each floor in order to protect the valuable...